Institute of Computing Technology, Chinese Academy IR
Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling | |
Wang, Bo1,2; Song, Ying2; Sun, Yuzhong2; Liu, Jun1 | |
2016-07-31 | |
发表期刊 | KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS |
ISSN | 1976-7277 |
卷号 | 10期号:7页码:2952-2971 |
摘要 | Outsourcing jobs to a public cloud is a cost-effective way to address the problem of satisfying the peak resource demand when the local cloud has insufficient resources. In this paper, we studied the management of deadline-constrained bag-of-tasks jobs on hybrid clouds. We presented a binary nonlinear programming (BNP) problem to model the hybrid cloud management which minimizes rent cost from the public cloud while completes the jobs within their respective deadlines. To solve this BNP problem in polynomial time, we proposed a heuristic algorithm. The main idea is assigning the task closest to its deadline to current core until the core cannot finish any task within its deadline. When there is no available core, the algorithm adds an available physical machine (PM) with most capacity or rents a new virtual machine (VM) with highest cost-performance ratio. As there may be a workload imbalance between/among cores on a PM/VM after task assigning, we propose a task reassigning algorithm to balance them. Extensive experimental results show that our heuristic algorithm saves 16.2%-76% rent cost and improves 47.3%-182.8% resource utilizations satisfying deadline constraints, compared with first fit decreasing algorithm, and that our task reassigning algorithm improves the makespan of tasks up to 47.6%. |
关键词 | Bag-of-tasks cloud computing hybrid cloud task scheduling resource management |
DOI | 10.3837/tiis.2016.07.005 |
收录类别 | SCI |
语种 | 英语 |
资助项目 | National Science Foundation of China[61202060] ; National Science Foundation of China[61428206] ; National Science Foundation of China[61221063] ; National Science Foundation of China[912183001] ; National Science Foundation of China[61521092] ; National Science Foundation of China[61221062] ; National High Technology Research and Development Program 863 of China[2012AA011003] ; Cheung Kong Scholar's Program ; Ministry of Education Innovation Research Team[IRT13035] |
WOS研究方向 | Computer Science ; Telecommunications |
WOS类目 | Computer Science, Information Systems ; Telecommunications |
WOS记录号 | WOS:000381404300005 |
出版者 | KSII-KOR SOC INTERNET INFORMATION |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | http://119.78.100.204/handle/2XEOYT63/8101 |
专题 | 中国科学院计算技术研究所期刊论文_英文 |
通讯作者 | Wang, Bo |
作者单位 | 1.Xi An Jiao Tong Univ, Dept Comp Sci & Technol, SPKLSTN Lab, Xian 710049, Shaanxi, Peoples R China 2.Chinese Acad Sci, Inst Comp Technol, State Key Lab Comp Architecture, Beijing 100190, Peoples R China |
推荐引用方式 GB/T 7714 | Wang, Bo,Song, Ying,Sun, Yuzhong,et al. Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling[J]. KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS,2016,10(7):2952-2971. |
APA | Wang, Bo,Song, Ying,Sun, Yuzhong,&Liu, Jun.(2016).Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling.KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS,10(7),2952-2971. |
MLA | Wang, Bo,et al."Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling".KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS 10.7(2016):2952-2971. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论