Institute of Computing Technology, Chinese Academy IR
QoS Promotion in Energy-Efficient Datacenters Through Peak Load Scheduling | |
Hu, Cheng1,2; Deng, Yuhui2,3; Min, Geyong4; Huang, Ping5; Qin, Xiao6 | |
2021-04-01 | |
发表期刊 | IEEE TRANSACTIONS ON CLOUD COMPUTING |
ISSN | 2168-7161 |
卷号 | 9期号:2页码:777-792 |
摘要 | To build energy-efficient datacenters, one widely used way is to dynamically manipulate the quantity of available hardware resources on demand. However, when bursty workloads appear, additional time overhead is required for resource gearing, thus incurring a performance degradation. To explore this problem, we present an intelligible analysis on the request handing in a VM. From the analysis, we find that, when workloads are overloaded (i.e., peak loads appear), the number of QoS guaranteed requests can be greatly increased by deferring the scheduling of a few requests. Inspired by this finding, we propose a Peak Load Scheduling Control (PLSC) method to promote the Quality of Service (QoS) of peak loads for modern energy-efficient datacenters. However, peak loads are usually difficult to identify. To overcome this difficulty, PLSC tracks the number of requests residing in a VM by leveraging a two-tier request queue maintained by it. When the number exceeds the capability of the VM, it means that peak loads appear. In this case, PLSC adds some delay-tolerant requests to the secondary queue. The scheduling of requests in the secondary queue is controlled with a lower priority than that of requests in the primary queue. Sequentially, with critical requests maintained in the primary queue, PLSC shortens the response time of critical requests. In addition, PLSC expands the number of QoS-guaranteed requests. Comprehensive experiments are conducted to attest the effectiveness of PLSC, by simulating a typical energy-efficient datacenter. The experimental results show that PLSC significantly promotes the QoS of workloads with a negligible impact on energy saving. |
关键词 | Workload burst performance promotion QoS guarantee dynamic power management data center |
DOI | 10.1109/TCC.2018.2886187 |
收录类别 | SCI |
语种 | 英语 |
资助项目 | NSFC[61572232] ; Science and Technology Planning Project of Guangzhou[201802010028] ; Science and Technology Planning Project of Guangzhou[201802010058] ; Science and Technology Planning Project of Nansha[2017CX006] ; Open Research Fund of Key Laboratory of Computer System and Architecture, Institute of Computing Technology, Chinese Academy of Sciences[CARCH201705] |
WOS研究方向 | Computer Science |
WOS类目 | Computer Science, Information Systems ; Computer Science, Software Engineering ; Computer Science, Theory & Methods |
WOS记录号 | WOS:000658339200028 |
出版者 | IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | http://119.78.100.204/handle/2XEOYT63/17659 |
专题 | 中国科学院计算技术研究所期刊论文_英文 |
通讯作者 | Deng, Yuhui |
作者单位 | 1.Guangdong Univ Foreign Studies, Sch Informat Sci & Technol, Guangzhou 510006, Guangdong, Peoples R China 2.Jinan Univ, Dept Comp Sci, Guangzhou 510632, Guangdong, Peoples R China 3.Chinese Acad Sci, Inst Comp Technol, State Key Lab Comp Architecture, Beijing 100080, Peoples R China 4.Univ Exeter, Coll Engn Math & Phys Sci, Exeter EX4 4QF, Devon, England 5.Temple Univ, Dept Comp & Informat Sci, Philadelphia, PA 19122 USA 6.Auburn Univ, Dept Comp Sci & Software Engn, Auburn, AL 36849 USA |
推荐引用方式 GB/T 7714 | Hu, Cheng,Deng, Yuhui,Min, Geyong,et al. QoS Promotion in Energy-Efficient Datacenters Through Peak Load Scheduling[J]. IEEE TRANSACTIONS ON CLOUD COMPUTING,2021,9(2):777-792. |
APA | Hu, Cheng,Deng, Yuhui,Min, Geyong,Huang, Ping,&Qin, Xiao.(2021).QoS Promotion in Energy-Efficient Datacenters Through Peak Load Scheduling.IEEE TRANSACTIONS ON CLOUD COMPUTING,9(2),777-792. |
MLA | Hu, Cheng,et al."QoS Promotion in Energy-Efficient Datacenters Through Peak Load Scheduling".IEEE TRANSACTIONS ON CLOUD COMPUTING 9.2(2021):777-792. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论